Tips are not sections
A second complete tip is a paid Variant choice and does not change the assembled piece count.

TAPER PROFILE
Choose this 9'6", 3-piece profile for heavy streamers and swung flies on large rivers and stillwaters, with its practical window centered on 31-65 feet.
Hardy Brothers
Hardy “The Fairy”Specifications
Character
Casting range
This Hardy "The Fairy" taper blank features oceanic-grade construction, with precisely tempered bamboo transitioning from 0.279" at 75" to 0.404" at 110". The 72-hour thermal treatment process preserves parabolic action integrity even with 550-grain setups. Six-strip Tonkin bamboo undergoes traditional carbonization, paired with 18% nickel silver ferrules that eliminate vibration in 2m/s Norwegian spawning currents.
Pre-finished with water-based varnish (optional raw blank), this blank allows professional customization for heavy-duty applications. The taper specifically optimizes 200g jigging fly manipulation, with progressive stress distribution from tip to grip that absorbs initial runs from 150lb juvenile bluefin tuna. Ideal for slow-pitch jigging near offshore platforms with T-20 sinking lines.
ROD BUILDING
Hardy “The Fairy”
All measurements are from the center of the tip top.
| Guide | Distance from tip | Type |
|---|---|---|
| 1 | 5.5 in | Snake guide |
| 2 | 11.5 in | Snake guide |
| 3 | 18.5 in | Snake guide |
| 4 | 26.5 in | Snake guide |
| 5 | 35 in | Snake guide |
| 6 | 44 in | Snake guide |
| 7 | 54 in | Snake guide |
| 8 | 64 in | Snake guide |
| 9 | 74.5 in | Stripping guide |
| 10 | 88 in | Stripping guide |
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant.
A second complete tip is a paid Variant choice and does not change the assembled piece count.
Choose Ferruled only when fitted ferrules are included; Unferruled leaves that work to the builder.
Contact us before ordering when supplied state, dimensions or included items are not listed.
BLANK-BUILDING PATH
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant on this page.
01
Keep taper, line weight, length and sections visible in the Collection.
02
Review tips, ferrule responsibility, included work, price and current fulfillment here.
03
Use the same blank context for guide positions and fit-critical measurements.
04
Recheck the Product record, then use current reviewed build resources.
Coverage boundaries and care practices.
Build, processing, tracking and delivery issues.
Plan components and reviewed build steps.
| Product | SKU | Description | Collection | Availability | Product type | Other details |
|---|