Tips are not sections
A second complete tip is a paid Variant choice and does not change the assembled piece count.

TAPER PROFILE
Choose this 8', 2-piece profile for nymphing, wet-fly work, and light streamers on small rivers and medium rivers, with its practical window centered on 24-53 feet.
Orvis
Orvis Battenkill from 1971Specifications
Character
Casting range


















Basic Information:
Core Specifications:
| Parameter | Specification |
|---|---|
| Material | 5-Year-Old Premium Tonkin Bamboo (Huaiji, China) |
| Length | 8 Feet |
| Sections | 2-Piece (1 Tip, 1 Butt) |
| Line Weight | 6wt |
| Taper Range | 0.102" (Tip) to 0.361" (Butt) |
| Action | Moderate / Classic Rhythm |
| Hardware | Pre-fitted Nickel Silver Ferrules (Hand-lapped) |
| Included | Suede-style Cloth Rod Bag |
Technical Features & Selling Points:
Recommended Applications:
Usage & Maintenance:
ROD BUILDING
Orvis Battenkill from 1971
All measurements are from the center of the tip top.
| Guide | Distance from tip | Type |
|---|---|---|
| 1 | 5 in | Snake guide |
| 2 | 11 in | Snake guide |
| 3 | 18 in | Snake guide |
| 4 | 26.5 in | Snake guide |
| 5 | 35.5 in | Snake guide |
| 6 | 46 in | Snake guide |
| 7 | 57.5 in | Snake guide |
| 8 | 70 in | Stripping guide |
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant.
A second complete tip is a paid Variant choice and does not change the assembled piece count.
Choose Ferruled only when fitted ferrules are included; Unferruled leaves that work to the builder.
Contact us before ordering when supplied state, dimensions or included items are not listed.
BLANK-BUILDING PATH
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant on this page.
01
Keep taper, line weight, length and sections visible in the Collection.
02
Review tips, ferrule responsibility, included work, price and current fulfillment here.
03
Use the same blank context for guide positions and fit-critical measurements.
04
Recheck the Product record, then use current reviewed build resources.
Coverage boundaries and care practices.
Build, processing, tracking and delivery issues.
Plan components and reviewed build steps.
| Product | SKU | Description | Collection | Availability | Product type | Other details |
|---|