Tips are not sections
A second complete tip is a paid Variant choice and does not change the assembled piece count.

TAPER PROFILE
Choose this 8'6", 3-piece profile for dry-fly work, nymphing, and wet-fly work on small rivers and medium rivers, with its practical window centered on 21-49 feet.
Granger
Wright-McGill Granger VictorySpecifications
Character
Casting range
This bamboo fly rod blank faithfully recreates the legendary Granger Victory taper, featuring a meticulously engineered dual-taper design. The front 40" section employs a 0.002"/inch gradual taper for exceptional casting sensitivity, while the final 30" accelerates to 0.005"/inch taper rate to store optimal energy for precise mid-range deliveries. The 8ft6in 3pc configuration combines portability with enhanced line control in cluttered environments, supported by 18% nickel silver ferrules that ensure smooth assembly. Crafted from select Tokin bamboo strips aged 9+ months, each blank comes pre-finished with water-based varnish (optional unfinished), allowing customization for experienced builders.
ROD BUILDING
Wright-McGill Granger Victory
All measurements are from the center of the tip top.
| Guide | Distance from tip | Type |
|---|---|---|
| 1 | 5 in | Snake guide |
| 2 | 11 in | Snake guide |
| 3 | 17.5 in | Snake guide |
| 4 | 24.5 in | Snake guide |
| 5 | 32.5 in | Snake guide |
| 6 | 42.5 in | Snake guide |
| 7 | 53 in | Snake guide |
| 8 | 64 in | Snake guide |
| 9 | 76 in | Stripping guide |
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant.
A second complete tip is a paid Variant choice and does not change the assembled piece count.
Choose Ferruled only when fitted ferrules are included; Unferruled leaves that work to the builder.
Contact us before ordering when supplied state, dimensions or included items are not listed.
BLANK-BUILDING PATH
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant on this page.
01
Keep taper, line weight, length and sections visible in the Collection.
02
Review tips, ferrule responsibility, included work, price and current fulfillment here.
03
Use the same blank context for guide positions and fit-critical measurements.
04
Recheck the Product record, then use current reviewed build resources.
Coverage boundaries and care practices.
Build, processing, tracking and delivery issues.
Plan components and reviewed build steps.
| Product | SKU | Description | Collection | Availability | Product type | Other details |
|---|