Tips are not sections
A second complete tip is a paid Variant choice and does not change the assembled piece count.

TAPER PROFILE
Choose this 7'6", 2-piece profile for dry-fly work and dry-dropper rigs on small rivers and medium rivers, with its practical window centered on 21-41 feet.
E. F. Payne Rod Company
Payne 100Read the taper profileSpecifications
Character
Casting range
This Payne 100 blank gives a builder a 4wt, 7'6", 2-piece starting point. The tip and ferrule choices above define the supplied configuration.
Payne 100 is listed as Tip / Quick / Light. Those labels are useful when comparing it with another taper; they do not predict one fixed casting result.
This page is for the blank rather than a finished rod. Plan the grip, reel seat, guides, and finish around the selected tip and ferrule state.
Keep the blank dry between build sessions. If the selected option is ferruled, pull the sections apart without twisting.
ROD BUILDING
Payne 100
All measurements are from the center of the tip top.
| Guide | Distance from tip | Type |
|---|---|---|
| 1 | 4.5 in | Snake guide |
| 2 | 10.5 in | Snake guide |
| 3 | 18 in | Snake guide |
| 4 | 27.5 in | Snake guide |
| 5 | 38 in | Snake guide |
| 6 | 50 in | Snake guide |
| 7 | 64 in | Stripping guide |
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant.
A second complete tip is a paid Variant choice and does not change the assembled piece count.
Choose Ferruled only when fitted ferrules are included; Unferruled leaves that work to the builder.
Contact us before ordering when supplied state, dimensions or included items are not listed.
BLANK-BUILDING PATH
Tip count, ferrule state, included work, price and fulfillment belong to the selected Variant on this page.
01
Keep taper, line weight, length and sections visible in the Collection.
02
Review tips, ferrule responsibility, included work, price and current fulfillment here.
03
Use the same blank context for guide positions and fit-critical measurements.
04
Recheck the Product record, then use current reviewed build resources.
Coverage boundaries and care practices.
Build, processing, tracking and delivery issues.
Plan components and reviewed build steps.
| Product | SKU | Description | Collection | Availability | Product type | Other details |
|---|